Installation of micro tiller supporting equipment


1、 Machine body installation

1. Place the micro tiller on a stable ground and unfold the four legs.

2. Place the prepared support plate at the bottom of the micro tiller according to the installation hole position and secure it with screws.

3. Hang the homework component on the drive shaft of the micro tiller and insert the lever into the lever seat.

4. Fix the homework blade facing the ground onto the work component of the micro tiller and fix it with screws.

2、 Hand push rod installation

1. Insert the hand push rod into the installation hole at the back of the host.

2. Tighten the upper screw of the hand push rod to prevent it from loosening.

3、 Installation of homework components

1. Install the deep loosening component: Insert the deep loosening component into the drive shaft of the micro tiller and confirm its firmness.

2. Install the blade components: Insert the blade components into the drive shaft of the micro tiller and confirm that they are secure.

3. Install the plowshare component: Insert the plowshare component into the drive shaft of the micro tiller and confirm its firmness.

4、 Adjusting homework height

1. Choose the appropriate homework height based on the actual situation.

2. Adjust the work blade to the appropriate depth through a lever.